          15. IGNITION SYSTEM                                         Mongoose/KXR 90/50


 PULSER COIL
 INSPECTION
 This test is performed with the stator
    installed in the engine.

 Disconnect the A.C. generator connector.

 Measure the pulser coil resistance between
 the blue/yellow and green wire terminals.
                                                            Pulser Coil Lead
 Resistance:
 Mongoose/KXR 90): 121.1/20°C
 Mongoose/KXR 50): 80160/20°C

 Note: The readings in this table are taken
       with a YF-3501 Tester.



 REMOVAL
 Refer to chapter 14 for the A.C. generator
 removal.




 IGNITION TIMING
 INSPECTION
 The CDI unit is not adjustable. If the
   ignition timing is incorrect, inspect the
   CDI unit, pulser coil and A.C. generator
   and replace any faulty parts.

 Remove the fan cover.

 Warm up the engine and check the ignition       "F" Mark                 Advance Mark
 timing with a timing light.
 When the engine is running at the ignition
 timing is correct if the "F" mark aligns with
 the index mark within 2°.
 Ignition Timing:
 Mongoose/KXR 90): BTDC28°/4000rpm
 Mongoose/KXR 50): BTDC15°/1700rpm

                                                                               15-8