9. FINAL REDUCTION DOWNTOWN 125 i
FINAL REDUCTION
REMOVAL
Drain the transmission gear oil into a clean
container (refer to the "TRANSMISSION
OIL" section in the chapter 3).
Remove the driven pulley (refer to the
"DRIVE PULLEY, DRIVE BELT AND
DRIVEN PULLEY" section in the chapter
8).
Remove nine bolts attached the
transmission case cover, then remove the
transmission case cover.
Countershaft Gasket Final gear
Remove the dowel pins and gasket.
Remove the final gear and shaft, then
remove the countershaft .
Drive shaft Dowel Pins
9-3