13. DRIVE TRAIN MXU 55EXi/MXU500i INSTALLATION Install the front drive case into the frame. Install and tighten the two mounting bolts/nuts to the specified torque. Torque: 4 kgf-m (40 N-m, 29 lbf-ft) Install the front propeller shaft. Front Propeller Shaft Connect all wire connectors and then install. 13-13