12. COOLING SYSTEM PEOPLE/PEOPLE S 250
Nuts Radiator
RADIATOR INSTALLATION
Install the radiator on the radiator bracket
with the two bolts and two nuts.
Bolts
Upper Hose Thermostatic Switch
Connect the upper and lower hoses and
secure them with hose bands.
Connect the thermostatic switch wire.
Thermostatic Switch Wire Lower Hose
Connect the fan motor wire couplers. Air Vent Tube
Connect the overflow tube and secure with
the tube clamp.
Fill the radiator with coolant. ( 3-9)
Connect the vent tube to the radiator filler.
After installation, check for coolant leaks.
If you want to refill the coolant , the
following procedure must be checked.
1. Please make the radiator filler and the
air vent tube to be separated. Overflow Tube Fan Motor Wire Coupler
2. Then start the engine , filled in the
coolant till the coolant flowed out from Outlet Tube of Reserve
the air vent tube. T k
3. Put the air vent tube on.
Connect the outlet tube of the reserve tank
and secure with the tube clamp.
12-8