5. ENGINE REMOVAL/INSTALLATION VITALITY 50
Lift the frame rear upward and move the
frame forward to separate it from the engine
and be careful not to damage the rear
fender.
ENGINE HANGER BRACKET
REMOVAL
Remove the engine hanger bracket nuts.
Nut
Remove the engine hanger bracket bolts
and engine hanger bracket.
The installation sequence is the reserve of
removal.
Torque: 4.55.5kg-m
Bolts
5-9