5. ENGINE REMOVAL/INSTALLATION AGILITY 50 2T
SERVICE INFORMATION
GENERAL INSTRUCTIONS
· A floor jack or other adjustable support is required to support and maneuver the engine. Be
careful not to damage the motorcycle body, cables and wires during engine removal.
· Use shop towels to protect the motorcycle body during engine removal.
· Parts requiring engine removal for servicing:
Crankcase
Crankshaft
TORQUE VALUES
Engine mounting bolt 4.55.5kg-m
Rear shock absorber lower mount bolt 2.43.0kg-m
Engine hanger bracket bolt 3.54.5kg-m
5-1