agility 50 rs Workshop-manual : Page 157

Microfiches
Image preview

Page 155

Image preview

Page 156

Image preview

Page 158

Image preview

Page 159

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 179
          14. BATTERY/CHARGING SYSTEM/
     A.C. GENERATOR                                             AGILITY 50



 A.C. GENERATOR CHARGING                          Charging Coil Wire
 COIL
 The inspection of A.C. generator charging
    coil can be made with the engine installed.
 INSPECTION
 Disconnect the A.C. generator 2P connector.
 Measure the resistance between the A.C.
 generator white wire and engine ground with
 an electric tester.
 Standard: 0.11.0(at 20)
 Replace the A.C. generator charging coil if
 the reading is not within the specifications.




 A.C. GENERATOR
 REMOVAL
 Remove the right side cover. ( 2-4)
 Remove the four bolts attaching the cooling
 fan cover to remove the fan cover.




                                                   Fan Cover




                                                                             14-6