12. FRAME COVERS LIKE 50 2T
Bolts
Remove the floor mat.
Remove the center cover. ( 12-3)
Remove the screws and bolts attaching the
front right and left side covers.
Remove the five bolts attaching the floor-foot.
Remove the floor-foot.
The installation sequence is the reverse of
removal.
Floor-Foot
Screws
LEG SHIELD LOW REMOVAL
Remove the met-in box.
Remove the body cover.
Remove the floor-foot.
Remove the front upper cover.
Remove the four screws attaching the leg
shield low.
Disconnect the leg shield low with the cowl
under cover.
The installation sequence is the reverse of
removal.
FRONT UPPER COVER REMOVAL
Remove the eight screws on the back of the
front upper cover.
Remove the bolt on the front of the front upper
cover.
Disconnect the signal light wire connector.
Remove the front upper cover.
The installation sequence is the reverse of
removal.
Screws
5