mxu 500 irs 1 Workshop-manual : Page 232

Microfiches
Image preview

Page 230

Image preview

Page 231

Image preview

Page 233

Image preview

Page 234

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 385 390 395 400 405 407
          11.FINAL REDUCTION/
   TRANSMISSION SYSTEM                                                            MXU 500 IRS

                                                  Stopper Lever Shaft
 INSTALLATION

 Make sure the shaft nut specified torque in
 the V-belt compartment while holds the
 stopper lever shaft.

 Torque: 3 kgf-m (30 N-m, 21.6 lbf-ft)




                                                                                 Nut




                                                                        Stopper Lever
 Hook the spring onto the hook part of the
 stopper lever, squeeze the spring in to the
 groove of the left crankcase.




                                                                    Spring



                                                                           Bolt/Washer
 Install the washer and a new bolt.
 Tighten the bolt to the specified torque while
 holds the shaft nut in the drive V-belt
 compartment.

 Torque: 2.5 kgf-m (25 N-m, 18 lbf-ft)




                                                  Shaft Nut    Stopper Lever


                                                                                         11-22