United Kingdom

We work in partnership with many official Kymco dealers around the world.
You can select the country of your choice from the list below, whatever your choice, we can deliver worldwide!

people gt 125 i Workshop-manual : Page 51

Microfiches
Enter the part number above
Image preview

Page 49

Image preview

Page 50

Image preview

Page 52

Image preview

Page 53

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 209
          5. ENGINE REMOVAL/INSTALLATION                                                          People GT 125i



 SERVICE INFORMATION

 GENERAL INSTRUCTIONS
 · A floor jack or other adjustable support is required to support and maneuver the engine. Be
   careful not to damage the scooter body, cables and wires during engine removal.
 · Use shop towels to protect the scooter body during engine removal.
 · Drain the coolant before removing the engine.
 · After the engine is installed, fill the cooling system with coolant and be sure to bleed air from the
   water jacket. Start the engine to check for coolant leaks.
 · Before removing the engine, the rear brake caliper must be removed first. Be careful not to bend
   or twist the brake fluid tube.


 SPECIFICATIONS

 Engine oil capacity: at disassembly: 1.2 L
                    : at change: 1.0 L
 Coolant capacity:

       Radiator capacity     : 0.87 liter
       Reserve tank capacity : 0.49 liter


 TORQUE VALUES
 Engine hanger (Engine side)              5.0 kgf-m (50 N-m)
 Engine hanger (Frame side)               6.5 kgf-m (65 N-m)




5-1