5. ENGINE REMOVAL/INSTALLATION VITALITY 50 Lift the frame rear upward and move the frame forward to separate it from the engine and be careful not to damage the rear fender. ENGINE HANGER BRACKET REMOVAL Remove the engine hanger bracket bolts and engine hanger bracket. The installation sequence is the reserve of removal. Torque: 4.55.5kg-m Engine Hanger Bracket Bolt 5-4