dinkstreet 300 i abs 1 Workshop-manual : Page 245

Microfiches
Image preview

Page 243

Image preview

Page 244

Image preview

Page 246

Image preview

Page 247

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 261
          20. EVAPORATIVE EMISSION CONTROL SYSTEM             Downtown 300i ABS



 PURGE CONTROL VALVE FLOW
 INSPECTION
 1. Connect a vacuum pump to the purge
    control valve vacuum tube and apply
    vacuum pressure of 45mm/Hg.
 2. Connect a pressure pump to the tube that
    goes to the charcoal canister and apply             Pressure Pump
    pressure. The flow must be over 9.4 liters
    per minute and replace the purge control
    valve with a new one if the specified flow
    is not reached.                              Vacuum Pump
 To prevent damage to the purge control
   valve, do not use high air pressure
   sources. Use a hand operated pressure
   pump only.


 INSTALLATION
 1. Install the purge control valve in the
    reverse order of removal.
 2. Route and reconnect the purge control
    valve tubes properly and securely.
 Be careful not to bend, twist or kink the
    tubes during installation.




 20-5