United Kingdom

We work in partnership with many official Kymco dealers around the world.
You can select the country of your choice from the list below, whatever your choice, we can deliver worldwide!

people gt 125 i Workshop-manual : Page 97

Microfiches
Enter the part number above
Image preview

Page 95

Image preview

Page 96

Image preview

Page 98

Image preview

Page 99

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 209
          8. DRIVE AND DRIVEN PULLEYS/
  KICK STARTER                                                                People GT 125i


                                                                         Apply grease
 DRIVEN PULLEY ASSEMBLY

 Clean any oil from the drive belt sliding
 surfaces on the driven face.

 Filling 12 g of grease to driven face inner
 side.




 Apply grease to lips of the new dust seals and
 install into the movable driven face.
 Coat new O-rings with grease and install
 them into the movable driven face grooves.

 Install the movable driven face onto the
 driven face.
 Install the guide rollers and guide roller pins.
 Filling 5 g of grease to each guide groove.

 Install the guide pins/rollers.                    Apply grease




 Install spring collar.
 Use the special tool to install spring and
 clutch, then install and tighten the nut to the
 specified torque.                                                 Lock Nut Wrench


 Torque: 5.5 ~6.5m (55~65N-m)

 Special tool:
 Clutch Spring Compressor          A120E00034




                                                                     Clutch spring compressor




                                                                                     8-16