people gt 300 i Workshop-manual : Page 144

Microfiches
Image preview

Page 142

Image preview

Page 143

Image preview

Page 145

Image preview

Page 146

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 224
          13. FUEL INJECTION SYSTEM                           People GT 300i



 TILT SWITCH
 INSPECTION
 Support the scooter level surface.
 Put the side stand up and engine stop switch
 is at "RUN".

 Turn the ignition switch to "OFF"
 Remove the screws, washers and tilt switch.
 Do     not disconnect the tilt switch
   connector during inspection.
 Place the tilt switch vertical as shown, and
 turn the ignition switch to "ON".
 Measure the voltage between the following
 terminals of the tilt switch connector with
 the connector connected.
              Terminal                Normal
 Violet/Red (+) ­ Green/Pink (-) 5 V (ECU
                                       voltage)
 Black/Blue (+) ­ Green/Pink (-) 0.41.4 V

 Incline the tilt switch 6510 degrees to the
 left or right with the ignition switch turned
 to "ON".
 Measure the voltage between the following
 terminals of the tilt switch connector with
 the connector connected.
              Terminal                Normal
 Violet/Red (+) ­ Green/Pink (-) 5 V (ECU
                                        voltage)
 Black/Blue (+) ­ Green/Pink (-) 3.74.4 V

 If repeat this test, first turn the ignition
 switch to "OFF", then turn the ignition
 switch to "ON".

 REMOVAL/INSTALLATION
 Disconnect the connector and remove two
 screws.
 Remove the Tilt switch.
 Installation is in the reverse order of removal.

 Install the tilt switch with its "UP" mark
   facing up.

 Tighten the mounting screws securely.


                                                          13-16