14.STEERING HANDLEBAR/FRONT WHEEL/FRONT
BRAKE/FRONT SHOCK ABSORBER/FRONT FORKGRAND DINK 125/150
Throttle Grip Throttle Cable
Lubricate the throttle grip front end with
grease and then install the throttle grip.
Connect the throttle cable to the throttle grip.
Install the right and left handlebar switches
and tighten the screws.
· Adjust the throttle grip free play to the
specified range of 26mm.
Brake Master Cylinder
Install the front and rear brake master
cylinders.
· Install the brake master cylinders by
aligning the index marks.
Bolt
FRONT WHEEL
REMOVAL
Jack the motorcycle front wheel off the
ground.
Remove the front axle nut to pull out the axle.
Remove the front wheel and the speedometer
gear unit.
Axle Nut Speedometer Gear Unit
INSPECTION
AXLE RUNOUT
Set the axle in V blocks and measure the
runout using a dial gauge.
The actual runout is of the total indicator
reading.
Service Limit: 0.2mm replace if over
14-5