super 8 125 Workshop-manual : Page 159

Microfiches
Image preview

Page 157

Image preview

Page 158

Image preview

Page 160

Image preview

Page 161

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 184
          14. BATTERY/CHARGING SYSTEM/
     A.C. GENERATOR                                                         SUPER8 125

 Connect the A.C. generator wire connector.      A.C. Generator Wire Connector




                                                 Woodruff Key
 Clean the taper hole in the flywheel off any
 burrs and dirt.
 Install the woodruff key in the crankshaft
 keyway.




                                                 Universal Holder
 Install the flywheel onto the crankshaft with
 the flywheel hole aligned with the crankshaft
 woodruff key.
 The inside of the flywheel is magnetic.
    Make sure that there is no bolt or nut
    before installation.
 Hold the flywheel with the universal holder
 and tighten the flywheel nut.
 Torque: 3.5~4.5kgf-m



  Special
 Universal Holder
 Install the cooling fan.
 Torque: 0.8~1.2kgf-m




                                                        Cooling Fan
14-9