10. A.C. GENERATOR/STARTER CLUTCH DINK 50/125
INSPECTION
Check the stator and pulse coil for damage.
Grommet Stator
INSTALLATION
Install the stator and tighten the stator mount
bolts to the specified torque.
Torque: 1 kgf-m (10 N-m, 7.2 lbf-ft)
Apply sealant to the grommet seating surface
and install it to the cover groove properly.
Install the pulse coil and tighten mount Pulser Coil
screws securely.
Clean the mating surfaces of the right
crankcase and cover.
Dowel Pins
Gasket
10-6