14. FRONT WHEEL/FRONT SUSPENSION/ STEERING SYSTEM MXU 300/250 Hole Install the handlebar switch by aligning the pin on the handlebar switch with the hole in the handlebar and then tighten the two screws. Pin "UP" Mark Place the right and left brake master cylinder on the handlebar and install the master cylinder holder with the "UP" mark facing up, aligning the punch mark on the handlebar with the holder joint seam. First tighten the upper bolt and then tighten the lower blot. Torque: 1.2 kg-m (12 Nm, 8.6 lbf-ft) Punch Mark Joint Seam 14-20