people 250 s 1 Workshop-manual : Page 226

Microfiches
Image preview

Page 224

Image preview

Page 225

Image preview

Page 227

Image preview

Page 228

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 243
          18. STARTING SYSTEM                                               PEOPLE/PEOPLE S 250


 Check for continuity between pairs of the
 commutator segments and there should be
 continuity.
 Also, make a continuity check between
 individual commutator segments and the
 armature shaft. There should be no
 continuity.




 STARTER MOTOR CASE CONTINUITY
 CHECK
 Check to confirm that there is no continuity
 between the starter motor wire terminal and
 the motor front cover.
 Also check for the continuity between the wire
 terminal and each brush.
 Replace if necessary.



                                                  Wire Terminal


 Measure the length of the brushes.
 Service Limit: 8.5mm replace if below




 Check for continuity between the brushes. If
 there is continuity, replace with new ones.




                                                                           18-4