spacer 50 125 1 Workshop-manual : Page 194

Microfiches
Image preview

Page 192

Image preview

Page 193

Image preview

Page 195

Image preview

Page 196

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 232
          16. BATTERY/CHARGING SYSTEM

 BATTERY
 Remove the seat and met-in box. ( 2-3)
 Remove the battery.
 First disconnect the battery negative (-) cable
 and then the positive (+) cable.

   When disconnecting the battery positive
   (+) cable, do not touch the frame with
   tool; otherwise it will cause short circuit
   and sparks to fire the fuel.

 The installation sequence is the reverse of
 removal.
   First connect the positive (+) cable and then
   negative (-) cable to avoid short circuit.
 BATTERY VOLTAGE INSPECTION
 (OPEN CIRCUIT VOLTAGE)
 Disconnect the battery cables.
 Measure the voltage between the battery
 terminals.
 Fully charged : 13.2V
 Undercharged : 12.3V max.
 Battery charging inspection must be
   performed with a voltmeter.
 CHARGING
 Connect the charger positive (+) cable to the
 battery positive (+) terminal.
 Connect the charger negative (-) cable to the
 battery negative (-) terminal.
   · Keep flames and sparks away from a
     charging battery.
   · Turn power ON/OFF at the charger, not
     at the battery terminals to prevent
     sparks near the battery.
   · Charge the battery according to the
     current specified on the battery.
   · During quick charging, the battery
     temperature should not exceed 45.
 · Quick charging should only be done in
     an emergency.
   · Measure the voltage 30 minutes after
     the battery is charged.
 Charging current: Standard : 0.5A
                    Quick : 5A
 Charging time : Standard : 510 hours
                    Quick : 30 minutes
 After charging: Open circuit voltage: 12.8V min.

                                                    16-4