19. SWITCHES/HORN/FUEL UNIT/THERMOSTATIC SWITCH
/TEMPERATURE GAUGE/INSTRUMENTS/LIGHTS
OIL METER
Oil Meter G/R B
G
INSPECTION
Remove the met-in box. ( 2-4) B
G
Remove the frame body cover. ( 2-4)
Disconnect the oil meter wire connectors
and remove the oil meter. Keep the oil
meter float at the lower position.
Measure the resistances between the wire
terminals as and shown in the left
figure.
Wire Terminals Resistance
Green/Red(+)Black(-) 516 Float
Green(-)Black(+)
Before removing the oil meter, be sure
to drain the motor oil and do not allow
sparks or flames near the working area.
Oil Meter Operation Inspection
Connect the oil meter wire connectors and
turn the ignition switch ON.
Measure the resistance between the wire
terminals with the float at upper position.
Light OFF
Green/Red(+)Black(-) About 340
Before performing the following test, Light ON
operate the turn signals to determine
that the battery circuit is normal.
TEMPERATURE GAUGE
Disconnect the wire from the thermosensor
and ground it to the engine.
Turn the ignition switch ON.
The temperature gauge needle should move
all the way to "H".
Do not leave the thermosensor wire
grounded for longer than 5 seconds or
the temperature gauge will be damaged.
19-6