zx scout 50 Workshop-manual : Page 80

Microfiches
Image preview

Page 78

Image preview

Page 79

Image preview

Page 81

Image preview

Page 82

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 183
          8. KICK STARTER/DRIVE PULLEY/
  CLUTCH/DRIVEN PULLEY                                                              ZX / SCOUT 50


                                                                                Clutch/Driven Pulley
 Remove the drive belt from the clutch/
 driven pulley.




                                                          Drive Belt



 DRIVE BELT INSTALLATION
 Turn the driven pulley clockwise and lift it
 up to expand the drive belt groove and then
 install a new drive belt.




                                                                       Drive Belt


                                                   Drive Face Nut      Drive Pulley Face     Drive Belt
 Set the drive belt on the drive pulley.
 Install the drive pulley face, starting ratchet
 and washer, then tighten the drive face nut.
 Torque: 3.54.0kg-m
 When installing the drive face nut, make
   sure that the tooth spaces of the drive
   pulley face and starting ratchet align
   with the teeth of the crankshaft.




                                                      Starting Ratchet              Washer


                                                                                                 8-8