5. ENGINE REMOVAL/INSTALLATION GRAND DINK 250 SERVICE INFORMATION GENERAL INSTRUCTIONS · A floor jack or other adjustable support is required to support and maneuver the engine. Be careful not to damage the motorcycle body, cables and wires during engine removal. · Use shop towels to protect the motorcycle body during engine removal. · Drain the coolant before removing the engine. · After the engine is installed, fill the cooling system with coolant and be sure to bleed air from the water jacket. Start the engine to check for coolant leaks. · Before removing the engine, the rear brake caliper must be removed first. Be careful not to bend or twist the brake fluid tube. SPECIFICATIONS Engine dry weight: 30kg Engine oil capacity: at disassembly: 1.1 liter Coolant capacity: Total capacity : 140020cc Radiator capacity : 100020cc Reserve tank capacity : 40020cc TORQUE VALUES Engine mounting bolt 49N-m Rear shock absorber upper mount bolt 39.2N-m 5-1