movie 125 euro 3 Workshop-manual : Page 209

Microfiches
Image preview

Page 207

Image preview

Page 208

Image preview

Page 210

Image preview

Page 211

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 211
          19. EXHAUST EMISSION CONTROL
        SYSTEM                                                                   MOVIE SYSTEM


     REED VALVE                                                            Cylinder Head Cover

     REMOVAL
     Remove the frame center cover.
     Remove the floor board cover.
     Disconnect the secondary air inlet tube
     connector.
     Remove the reed valve cover four bolts and
     two secondary air outlet tube nuts.

     Remove the three bolts attaching the reed
     valve cover and the reed valve.




                                                      Reed Valve Stopper            Reed Valve Cover

     INSPECTION
     Check the reed valve for cracks, damage,
     big clearance or weak reeds. Replace if
     necessary.
     Check the gasket and O-ring for damage or
     deterioration and replace if necessary.
     Reed valve stopper clearance: 4.6mm

     INSTALLATION
     Install the reed valve in the reverse order of
     removal.


      · When installing, be careful not to                       Reed Stopper
        bend or twist the tubes and check for
        proper installation.
                                                                       Reed Valve stopper



19-4
19