zx scout 50 Workshop-manual : Page 89

Microfiches
Image preview

Page 87

Image preview

Page 88

Image preview

Page 90

Image preview

Page 91

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 183
          8. KICK STARTER/DRIVE PULLEY/
  CLUTCH/DRIVEN PULLEY                                            ZX / SCOUT 50


 Set the driven pulley, driven face spring
 and clutch assembly onto the clutch spring
 compressor. Compress the tool and install
 the 39mm drive plate nut.
 Tighten the 39mm nut to the specified
 torque.
 Torque: 5.06.0kg-m




                                                    Clutch/Driven Pulley
 CLUTCH/DRIVEN PULLEY
 INSTALLATION
 Install the drive belt on the clutch/driven
 pulley and then install the clutch/driven
 pulley onto the drive shaft.




                                               Clutch Outer

 Install the clutch outer.
 Hold the clutch outer with the universal
 holder.
 Install and tighten the 10mm clutch outer
 nut.
 Torque: 3.54.5kg-m
 Install the left crankcase cover. ( 8-6)




                                                   Universal Holder




8-17