10.FINAL REDUCTION/
TRANSMISSION SYSTEM ATV 300/250
INSTALLATION
Reverse the "TRANSMISSION REVOVAL"
section procedures.
Install the primary drive axle. (Reverse the
"PRIMARY DRIVE AXLE" procedures.)
Install the counter axle.
Install the main axle.
Install the shift cam.
Install the shift fork.
Install the guide bar.
Install the shift shaft. Gear Change Switch
Make sure that the lever on the gear
change switch correctly engages with the
locating slot on the shift shaft.
Align the mark on the shift shaft gear
with the mark on the shift cam gear.
Install the shift cam stopper and tighten the
plug.
Torque: 4.8 kgf-m (48 N-m, 35 lbf-ft)
Dowel Pins
Install the dowel pins and a new gasket onto
the right crankcase.
Install the transmission case cover and tighten
the transmission case cover bolt.
Torque: 2.7 kgf-m (27 N-m, 20 lbf-ft)
Fill the engine with oil and install the oil
filler bolt. (Refer to the "TRANSMISSION
OIL REPLACEMENT" section in the chapter
3) Gasket
Specified Gear Oil:
KYMCO SIGMA GEAR OIL 90#
Oil Capacity:
At change:
0.3 liter (0.264 lmp qt, 0.318 US qt)
At disassembly:
0.4 liter (0.352 lmp qt, 0.424 US qt)
10-12