10. FINAL REDUCTION/
TRANSMISSION SYSTEM ATV 150/125
Install the dowel pins and a new gasket onto
the right crankcase.
Tighten the crankcase attaching bolts.
Torque: 1 kgf-m (10 N-m, 7.2 lbf-ft)
Bolts
Tighten the left crankcase attaching bolt.
Bolts
Marks
Install the crankshaft gear and washer.
Make sure the "INSIDE" mark on the
washer facing the right crankcase.
Install the washer, balancer gear, woodruff
key, oil drive gear, washer and nut, then
tighten the nut (Left threaded) to specified
torque using the special tool.
Torque: 4.5 kgf-m (45 N-m, 32 lbf-ft)
Special tool:
Lock nut wrench: E010
Align the mark on the balancer gear
.
with the mark on the crankshaft gear.
Make sure the marks on the balancer
gear and crankshaft gear facing out.
Install the oil pump (refer to chapter 4)
10-10