14.STEERING HANDLEBAR/FRONT WHEEL/FRONT BRAKE/FRONT SHOCK ABSORBER/FRONT FORK GRAND DINK 125/150 INSTALLATION Apply grease to the top and bottom ball races and install 26 steel balls on the top ball race and 19 steel balls on the bottom ball race. Then, install the front fork. Bottom Ball Race Apply grease to the top cone race and install it. Tighten the top cone race and then turn the steering stem right and left several times to make steel balls contact each other closely. Check that the steering stem rotates freely without vertical play. Install the steering stem lock nut and tighten Lock Nut Wrench it while holding the top cone race. Torque: 78.4117.6N-m Install the front wheel. ( 14-7) Install the front brake caliper. ( 14-12) Install the front inner fender. ( 2-6) Install the throttle grip and the right and left handlebar switches.( 14-5) Install the right and left brake master cylinders. ( 14-5) Lock Nut Wrench 14-18