super 8 50 2t 1 Workshop-manual : Page 165

Microfiches
Image preview

Page 163

Image preview

Page 164

Image preview

Page 166

Image preview

Page 167

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 188
          15. ELECTRICAL EQUIPMENT                                            SUPER8 50 2T

BATTERY
 BATTERY REMOVAL
 Remove the battery cover.
 Disconnect the battery cables .

   First disconnect the battery negative (-)
   cable and then the positive (+) cable.

 Remove the battery.
 The installation sequence is the reverse of
 removal.

 BATTERY CHARGING (OPEN CIRCUIT
 VOLTAGE) INSPECTION
 Remove the battery cover and disconnect the
 battery cables.                                    Battery Cover
 Measure the voltage between the battery
 terminals.
 Fully charged : 13.0V13.2V                                           Battery
 Undercharged : 12.3V max.

   Battery charging inspection must be
   performed with an electric tester.

 CHARGING METHOD
 Connect the charger positive (+) cable to the
 battery positive (+) cable.
 Connect the charger negative (-) cable to the
 battery negative (-) cable.
 · Keep flames and sparks away from a
     charging battery.
   · Turn power ON/OFF at the charger, not
     at the battery terminals to prevent sparks
     near the battery.
   · Charge the battery according to the
                                                    Black            Red
     current specified on the battery surface.

 Charging current:Standard: 0.4A
                    Quick       : 4A
 Charging time : Standard: 5 hours
                    Quick       : 0.5 HOUR
 After charging: Open circuit voltage: 12.8V min.
 · Quick charging should only be done in
     an emergency.
   · During quick charging, the battery
     temperature should not exceed 45.
   · Measure the voltage 30 minutes after
     the battery is charged.




                                                                                15-4