super 8 50 2t 1 Workshop-manual : Page 170

Microfiches
Image preview

Page 168

Image preview

Page 169

Image preview

Page 171

Image preview

Page 172

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 188
          15. ELECTRICAL EQUIPMENT                               SUPER8 50 2T



 Performance Test
 Remove the ignition coil.




                                                   Ignition Coil
 Inspect the ignition coil with an ignition coil
 tester.

    Follow the ignition coil tester manufac-
    turer`s instructions.

 1. Turn the changeover switch to 12V and
    connect the ignition coil to the tester.
 2. Turn the power switch ON and check the
    spark from the watch window.
 Good : Normal and continuous spark
 Faulty : Weak or intermittent spark

    The test is performed at both conditions
    that the ignition coil is cold and hot.




 A.C. GENERATOR
 Exciter Coil/Pulser Coil Inspection

   This test is performed with the stator
   installed in the engine.
 Remove the met-in box. ( 12-4)
 Disconnect the A.C. generator wire
 connector.
 Measure the pulser coil resistance between
 the blue/yellow wire and ground.
 Resistance (20): 100150




15-9