11.FINAL REDUCTION/
TRANSMISSION SYSTEM UXV 500
Nut Front Drive Shaft
Install the output shaft, secondary driven
bevel gear and shim
Install the rear middle joint.
Install the front drive shaft.
Hold universal joint nut by using a suitable
bar, then install and tighten the rear middle
joint nut to the specified torque.
Torque:
14 kgf-m (140 N-m, 100.8 lbf-ft) Apply oil
Remove the front drive shaft. Bar Universal Joint
11-7