13. REAR WHEEL/SWING ARM/
HYDRAULIC BRAKE ATV 150/125
Pivot Shaft
INSTALLATION
Reverse the "REMOVAL" procedure.
Apply grease onto the collar, bush, pivot
shaft and thrust cover.
Install the swing arm and tightening the nut.
Torque: 7 kgf-m (70 N-m, 50 lbf-ft)
MXU 150:
Install the shock absorber and tightening the
upper and lower mounting bolts.
Torque: 4 kgf-m (40 N-m, 29 lbf-ft)
MX'er 150/125:
Install the shock absorber and tightening the
upper mounting bolt.
Torque: 4 kgf-m (40 N-m, 29 lbf-ft)
Install the shaft, washer and cotter pin.
Always use a new cotter pin.
Install the rear hub and rear wheels.
Refer to the "REAR WHEEL
INSTALLATION" section.
Adjust the drive chain slack.
Refer to the "DRIVE CHAIN SLACK
ADJUSTMENT" section in the CHAPTER
3.
Approximately: 1020 mm (0.40.8 in)
13-17