11. FRONT WHEEL/SUSPENSION/
STEERING ZING II 125
Steel Balls Top Cone Race
Tighten the bearing adjusting nut until it
seats against the top cone race, then turn it
back 1/8 turn.
Check that the steering stem rotates
freely and that there is no vertical play.
Steering Stem
Install the front fork. (Refer to 11-15.)
Install the top fork bridge, washer and
steering stem nut.
Tighten the steering stem nut.
Torque: 6.09.0 kg-m
Properly adjust the installed front fork. (Refer
to 11-15.)
Special tool:
Steering stem wrench F006 Steering Stem Wrench
Steering Stem Lock Nut Wrench F007
Steering Stem
11-17