grand dink 250 Workshop-manual : Page 59

Microfiches
Image preview

Page 57

Image preview

Page 58

Image preview

Page 60

Image preview

Page 61

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220
          5. ENGINE REMOVAL/INSTALLATION                                                 GRAND DINK 250


 SERVICE INFORMATION

 GENERAL INSTRUCTIONS
 · A floor jack or other adjustable support is required to support and maneuver the engine. Be
   careful not to damage the motorcycle body, cables and wires during engine removal.
 · Use shop towels to protect the motorcycle body during engine removal.
 · Drain the coolant before removing the engine.
 · After the engine is installed, fill the cooling system with coolant and be sure to bleed air from the
   water jacket. Start the engine to check for coolant leaks.
 · Before removing the engine, the rear brake caliper must be removed first. Be careful not to
   bend or twist the brake fluid tube.


 SPECIFICATIONS
 Engine dry weight: 30kg
 Engine oil capacity: at disassembly: 1.1 liter
 Coolant capacity:
      Total capacity           : 140020cc
      Radiator capacity        : 100020cc
      Reserve tank capacity : 40020cc


 TORQUE VALUES
 Engine mounting bolt                 49N-m
 Rear shock absorber upper mount bolt 39.2N-m




5-1