super 8 50 2t 1 Workshop-manual : Page 76

Microfiches
Image preview

Page 74

Image preview

Page 75

Image preview

Page 77

Image preview

Page 78

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 188
          7. A.C. GENERATOR                                                         SUPER8 50 2T


                                                 A.C. Generator Wire
 Install the A.C. generator and pulser coil
 bolts.
 Connect the A.C. generator wire connector.




 Clean the taper hole in the flywheel off any
 burrs and dirt.
 Install the woodruff key in the crankshaft
 keyway.




                                                             Woodruff Key



 Install the flywheel onto the crankshaft with
 the flywheel groove aligned with the
 crankshaft woodruff key.
 Hold the flywheel with the universal holder
 and install the 10mm flywheel flange nut.
 Torque: 3.54.0kg-m
 Start the engine and check the ignition
 timing. ( 3-8)
 Install other removed parts in the reserve
 order of removal.




                                                       Universal Holder



7-5