11.FINAL REDUCTION/
TRANSMISSION SYSTEM UXV 500
Remove the fifteen bolts from right
crankcase.
Remove the two dowel pins.
INSTALLATION
Apply a light but through coating of liquid
gasket (Threebond 1215 or equivalent) to all
crankcase mating surfaces except the oil
passage area.
Dowel Pins
Install the right crankcase and tighten the
bolts in a crisscross pattern in 2 or 3 steps.
Torque:
1.2 kgf-m (12 N-m, 8.6 lbf-ft) Apply oil
11-11