zx scout 50 Workshop-manual : Page 178

Microfiches
Image preview

Page 176

Image preview

Page 177

Image preview

Page 179

Image preview

Page 180

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 183
          16. INSTRUMENT/SWITCHES/LIGHTS                                    ZX / SCOUT 50

 INSTALLATION
 The installation sequence is the reverse of
 removal.




                                                                       Retainer



 OIL METER
 INSPECTION
 Remove the met-in box. ( 12-4)                Oil Meter
                                                            G/R               B
 Remove the frame body cover. ( 12-4)                                   G G
 Disconnect the oil meter wire connectors                         B
 and remove the oil meter. Keep the oil
 meter float at the lower position.
 Measure the resistances between the wire
 terminals as and shown in the left
 figure.

      Wire Terminals           Resistance
                                                   Float
 Green/Red(+)Black(-)           516
    Green(-)Black(+)               




 Oil Meter Operation Inspection
 Connect the oil meter wire connectors and
 turn the ignition switch ON.
 Measure the resistance between the wire
 terminals with the float at upper position.
                                                           Light OFF
 Green/Red(+)Black(-)         About 340
                                                                       4.51.0mm
                                                           Light ON




16-3