vitality 50 2t 4t Workshop-manual : Page 89

Microfiches
Image preview

Page 87

Image preview

Page 88

Image preview

Page 90

Image preview

Page 91

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 273
          5. ENGINE REMOVAL/INSTALLATION                           VITALITY 50


 ENGINE HANGER BRACKET
 INSPECTION
 Inspect the stopper rubbers and bushings
 for damage and replace with new ones if
 necessary.




                                              Bushings          Bushings




 ENGINE INSTALLATION
 Install the engine in the reverse order of
 removal.

   Cables and wires should be routed
   properly.

 Torque Values:
 Engine mounting bolt : 4.55.5kg-m
 Rear shock absorber lower mount bolt:
                        2.43.0kg-m

 Perform the following inspections and
 adjustments after installation.
 · Rear brake cable ( 3-2)




                                                               5-10