vitality 50 2t 4t Workshop-manual : Page 88

Microfiches
Image preview

Page 86

Image preview

Page 87

Image preview

Page 89

Image preview

Page 90

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 273
          5. ENGINE REMOVAL/INSTALLATION                                VITALITY 50

 Lift the frame rear upward and move the
 frame forward to separate it from the engine
 and be careful not to damage the rear
 fender.




 ENGINE HANGER BRACKET
 REMOVAL
 Remove the engine hanger bracket nuts.




                                                Nut

 Remove the engine hanger bracket bolts
 and engine hanger bracket.

 The installation sequence is the reserve of
 removal.
 Torque: 4.55.5kg-m




                                                      Bolts

5-9