grand dink 250 Workshop-manual : Page 88

Microfiches
Image preview

Page 86

Image preview

Page 87

Image preview

Page 89

Image preview

Page 90

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220
          8. DRIVE AND DRIVEN PULLEYS/
  KICK STARTER                                                          GRAND DINK 250


 Install the drive belt air tube and tighten the
 tube band screw.




                                                           Tube Band Screw
                                                                        Universal Holder
 DRIVE PULLEY
 REMOVAL
 Remove the left crankcase cover.
 Hold the drive pulley using an universal
 holder and remove the drive face nut and
 washer.
 Remove the drive pulley face.
   Special
 Universal Holder
                                                          Drive Pulley Face

                                                   Movable Drive Face
 Remove the drive belt from the movable
 drive face.




                                                           Drive Belt

 INSPECTION
 Check the drive belt for cracks, separation or
 abnormal or excessive wear.
 Measure the drive belt width.
 Service Limit: 22.0mm replace if below
 · Use specified genuine parts for
     replacement.




                                                                                           8-4