stryker 125 Workshop-manual : Page 61

Microfiches
Image preview

Page 59

Image preview

Page 60

Image preview

Page 62

Image preview

Page 63

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 233
          6. CYLINDER HEAD/VALVES                                                 STRYKER 125/150


 Remove the four bolts attaching the engine
 front bracket and the bracket.                Upper Hanger
 Remove the three engine upper hanger bolts
 and the hanger.
 Remove the two nuts attaching the engine
 rear bracket.
 Remove the two bolts attaching the engine
 lower fixer.
 Remove the two engine rear bracket bolts to
 tilt the engine forward.
 Remove the lower engine hanger bolt to
 remove the engine.

                                               Lock Nut   Lower Fixer    Front Bracket




 ENGINE INSTALLATION
 Install the engine in the reverse order of
 removal.
 Install the engine to its original position
 with a jack or other adjustable support.

  · When installing the engine, do not
    damage the bolt threads and route the
    wires and cables properly.
  · Install the gear shift pedal by aligning
    the punch mark on the pedal with that
    on the spindle.
 Torques:
 Engine upper bracket bolt: 3.54.5kg-m
 Engine hanger bolt: 3.54.5kg-m


 After installation, perform the following
 inspections and adjustments:
 · Throttle operation
 · Clutch lever free play adjustment
 · Drive chain adjustment




6-3