mxer mxu 150 Workshop-manual : Page 229

Microfiches
Image preview

Page 227

Image preview

Page 228

Image preview

Page 230

Image preview

Page 231

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 244
          16. STARTING SYSTEM                                    ATV 150/125


 STARTER MOTOR INSTALLATION
 Connect the starter motor cable connector
 and properly install the waterproof rubber
 jacket.
 Check the O-ring for wear or damage and
 replace if necessary.
 Apply grease to the O-ring and install the
 starter motor.
 Tighten the two mounting bolts.
 The starter motor cable connector must
   be installed properly.                     O-ring




                                                          16-6