11. CRANKCASE/CRANKSHAFT PEOPLE 125/150
Install the dowel pins and a new gasket onto Gasket
the left crankcase.
Place the right crankcase over the
crankshaft and onto the left crankcase.
Dowel Pins
Tighten the two crankcase attaching bolts.
Torque: 0.9kg-m
Crankcase Bolts
11-5