vitality 50 2t 4t Workshop-manual : Page 83

Microfiches
Image preview

Page 81

Image preview

Page 82

Image preview

Page 84

Image preview

Page 85

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 273
          5. ENGINE REMOVAL/INSTALLATION                                 VITALITY 50

 Lift the frame rear upward and move the
 frame forward to separate it from the engine
 and be careful not to damage the rear
 fender.




 ENGINE HANGER BRACKET
 REMOVAL
 Remove the engine hanger bracket bolts
 and engine hanger bracket.
 The installation sequence is the reserve of
 removal.
 Torque: 4.55.5kg-m




                                                Engine Hanger Bracket Bolt



                                                                             5-4