zing 125 qe Workshop-manual : Page 145

Microfiches
Image preview

Page 143

Image preview

Page 144

Image preview

Page 146

Image preview

Page 147

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 158
          16. CHARGING SYSTEM                                                              ZING125
 BATTERY                                            Terminal (+)     Set Plate   Terminal (-) Battery
 REMOVAL
 Remove the left side cover.
 First disconnect the battery negative cable
 and then the positive cable.
 Remove the battery plate lock nuts.
 Remove the battery.

   When disconnecting the battery positive
   (+) cable, do not touch the frame with
   tool; otherwise it will cause short circuit
   and sparks to damage the battery and
   ignite the gasoline.                                            Lock Nuts


   First connect the positive (+) cable and then
   the negative (-) cable to avoid short circuit.
 BATTERY VOLTAGE (OPEN CIRCUIT
 VOLTAGE) INSPECTION
 Remove the left side cover.
 Disconnect the battery cables.
 Measure the voltage between the battery
 terminals.
 Fully charged : 13.1V
 Undercharged : 12.3V
 The Battery charging inspection must be
   performed with a voltmeter.
 CHARGING
 Connect the charger positive (+) cable to the
 battery positive (+) terminal.
 Connect the charger negative (-) cable to the
 battery negative (-) terminal.
   · Keep flames and sparks away from a
     charging battery.
   · Turn power ON/OFF at the charger, not
     at the battery terminals to prevent
     sparks near the battery to avoid
     explosion.
   · Charge the battery according to the
     current specified on the battery.
   ·Quick charging should only be done in
     an emergency.
   · Measure the voltage 30 minutes after
     the battery is charged.

 Charging current: Standard : 0.7A
                    Quick : 3.0A
 Charging time : Standard : 510 hours
                    Quick : 1 hour
 After charging: Open circuit voltage: 12.8V min.


16-3