zing 125 qe Workshop-manual : Page 49

Microfiches
Image preview

Page 47

Image preview

Page 48

Image preview

Page 50

Image preview

Page 51

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 158
          5. ENGINE REMOVAL/INSTALLATION                                                                                  ZING125

 SERVICE INFORMATION .......................................................................................................5-1
 ENGINE REMOVAL .................................................................................................................5-2
 ENGINE INSTALLATION........................................................................................................5-3



 SERVICE INFORMATION
 GENERAL INSTRUCTIONS
 · A engine stand or floor jack is required to support and maneuver the engine.
 · The following parts can be serviced with the engine installed in the frame:
    Cylinder head/valves (Section 6)
    Cylinder/piston (Section 7)
    Starter motor/generator/left crankcase cover/starter clutch/camshaft (Section 8)
    Clutch/gear shift mechanism (Section 9)
 · When removing and installing the engine, do not use a hammer or screw driver to strike or pry
   the engine.
 · Do not damage the crankcase mating surfaces and clean off all gasket materials from the mating
   surfaces.
 · After crankcase assembly, check that the transmission system operates smoothly.
 · After engine installation, start the engine and check that the lubrication system is normal.




 Engine oil capacity:
   At disassembly : 1.1 liter
   At change        : 0.9 liter



 TORQUE VALUES
 Engine bracket bolt                                 2.02.5 kg-m
 Drive gear lock bolt                                0.81.2 kg-m
 Exhaust muffler hanger lock bolt                    2.43.0 kg-m
 Rear fork pivot nut                                 5.56.5 kg-m
 Exhaust muffler joint lock nut                      0.81.2 kg-m




5-1