8. STARTER MOTOR/GENERATOR/LEFT CRANK-
CASE COVER/STARTER CLUTCH ZING II 125
STARTER MOTOR REMOVAL
Remove the starter motor mounting two bolts
and the motor.
Inspect the starter motor O-ring for damage
or deterioration.
Inspect the starter motor pinion for wear or
damage.
Mounting Bolts
Cover O-ring Reduction Gear
Remove the three bolts attaching the starter
motor reduction gear cover.
Remove the reduction gear cover.
Remove the reduction gear, shaft and
washers.
Inspect the reduction gear for wear or
damage.
Inspect the reduction gear cover O-ring for
damage or deterioration.
Washers Shaft
Bolts
LEFT CRANKCASE COVER/ AC
GENERATOR REMOVAL
Disconnect the neutral light switch wire.
Remove the left crankcase cover eight bolts.
Remove the left crankcase cover and two
dowel pins.
Clean off all gasket material from the left
crankcase cover.
Remove the reduction pinion.
Neutral Light Wire
Hold the flywheel with a flywheel holder. Flywheel Puller
Remove the flywheel lock bolt.
Remove the flywheel using a flywheel puller.
Special Tool
Flywheel holder E021
Flywheel puller E005
Flywheel Holder Flywheel
8-3