movie 125 euro 3 Workshop-manual : Page 127

Microfiches
Image preview

Page 125

Image preview

Page 126

Image preview

Page 128

Image preview

Page 129

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 211
          12. FRONT WHEEL/FRONT BRAKE/
    FRONT SUSPENSION                                             MOVIE SYSTEM

                                                     Speedometer Cable
 FRONT WHEEL
 REMOVAL
 Jack the motorcycle front wheel off the
 ground.
 Remove the speedometer cable set screw
 and disconnect the speedometer cable.
 Remove the front brake cable.




                                                         Screw    Front Brake Cable

 Remove the front axle nut and pull out the
 axle.
 Remove the front wheel.
 Remove the front brake panel.




                                                Axle Shaft                 Axle Nut

 INSPECTION
 AXLE RUNOUT
 Set the axle in V blocks and measure the
 runout using a dial gauge.
 The actual runout is  of the total indicator
 reading.
 Service Limit: 0.2mm replace if over




 WHEEL RIM
 Check the wheel rim runout.
 Service Limits:
 Radial: 2.0mm replace if over
 Axial: 2.0mm replace if over




12-3