super 9 3 Workshop-manual : Page 116

Microfiches
Image preview

Page 114

Image preview

Page 115

Image preview

Page 117

Image preview

Page 118

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205
          10. CRANKCASE/CRANKSHAFT                                                  SUPER 9   50


 Remove the remaining bearing on the
 crankshaft side using the universal bearing
 puller.
 When separating the crankcase, the oil
   seals must be removed.   Replace the oil
   seals with new ones.




                                               Universal Bearing Puller


 CRANKSHAFT INSPECTION
 Measure the connecting rod big end side
 clearance.
 Service Limit: 0.6mm replace if over




 Measure the connecting rod big end radial
 clearance at two points in the X and Y
 directions.
 Service Limit: 0.04mm replace if over




10-3