super 9 3 Workshop-manual : Page 70

Microfiches
Image preview

Page 68

Image preview

Page 69

Image preview

Page 71

Image preview

Page 72

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205
          5. ENGINE REMOVAL/INSTALLATION                                 SUPER 9         50


 ENGINE HANGER BRACKET                                   Engine Hanger
 INSPECTION
 Inspect the stopper rubbers and bushings
 for damage and replace with new ones if
 necessary.




                                              Bushings               Stopper Rubbers


 ENGINE INSTALLATION
 Install the engine in the reverse order of
 removal.

   Cables and wires should be routed
   properly.

 Torque Values:
 Engine mounting bolt : 44.153.9N-m
 Rear shock absorber lower mount bolt:
                      : 23.529.4N-m




 Perform the following inspections and
 adjustments after installation.
 · Throttle cable
 · Oil pump control cable ( 4-2)
 · Rear brake system ( 3-11)
 · Oil pump bleeding ( 4-4)




                                                                               5-4